Planning Schedule - Header Image
Planning Schedule - Header Image
Planning Schedule - Header Image
Content info
Product Solutions
Product Solutions
Product Solutions
Mar 27, 2025
7
min read
Written by
Eve
GTM

「Product」 Schedule Planning

The New Core Cloud " Schedule Planning " is launched based on the production instructions generated by the MRP system, accurately allocating production tasks to matching workshops based on product delivery deadlines, priorities, and workshop resource conditions.

👉 Book a 'Product DEMO' demonstration now!


Narrative Card

💡 ' Schedule Planning '

The New Core Cloud Workshop Planning solution focuses on core production management, striving to enhance production efficiency, reduce costs, and ensure product quality by integrating resources and task arrangements across the entire process. This solution is initiated based on the production instructions generated by the MRP system, guided by product delivery deadlines, priorities, and workshop resource status, precisely allocating part production tasks to matching workshops, production lines, equipment, and personnel. At the same time, daily production action plans are formulated, and real-time dynamic information collection capabilities are utilized to flexibly adjust production progress, ensuring the efficient execution of the plan and the achievement of objectives.


👉 Click here for a one-minute video to understand 'Schedule Planning'!


Industry Pain Points and Breakthrough Points

🌑 Before Application (BEFORE)

  1. Difficulties in coordinating supply chain resource planning and workshop production planning, wasting manpower

  2. Complex production rules and intricate processes: Different products have various requirements for labor, machines, materials, methods, environments, etc., coupled with complex production switching rules, making it challenging for manual scheduling to fully consider all possibilities, affecting scheduling efficiency and quality, heavily relying on experienced planners.

🌕 After Application (AFTER)

  1. Efficient scheduling, one-click delivery, saving labor and time costs for enterprises

  2. Low learning costs, the ability to formulate reliable scheduling plans is no longer limited to specific groups, scheduling algorithms reference actual workshop data to assist planners in understanding the site, including adjustments for abnormal work orders.

  3. Scheduling results are precise to equipment and shifts, ensuring that scheduling results are consistent with production site capacity load.


Scenario Analysis


Scenario Pain Points

  1. High scheduling costs and dependency on experience

    Workshop planning requires multiple planners to collaborate, record workshop conditions, and summarize plans. To ensure the reliability of the plan, it is necessary to hire a large number of planners. If personnel changes occur, it can lead to instability and chaos in planning results in a short time.

  2. Limited dimensions in scheduling consideration

    The scheduling fails to consider the复杂多样的 execution situations on the production site, making the output scheduling results hard to land, with actual production having weak reliance on and reference value for the schedule.

  3. Delayed feedback on production progress

    Traditional management methods lack effective feedback mechanisms for workshop production progress, making it difficult for planners to make targeted adjustments when encountering abnormal events; subsequent scheduling may also be affected by abnormal situations.

  4. Frequent changes in production demands

    Frequent changes in customer demands mean that one change impacts the entire plan. It is challenging to adjust rapidly, and planners are hesitant to make adjustments, making it difficult to meet order delivery needs.


New Core Cloud Schedule Planning Solution

  1. Efficient one-click scheduling system

    By considering production orders and resource availability comprehensively, production tasks and optimization levels are rationally arranged to quickly output scheduling results that meet customer demands.

  2. Scheduling algorithms supporting various scenarios

    Provides over twenty scheduling parameters that can be freely combined according to actual scenarios, meeting different scheduling needs. Preset algorithms for general scenarios can help customers quickly resolve scheduling pain points.

  3. Real-time monitoring and feedback

    Provides multiple dimensional views of scheduling, helping planners quickly access effective information. Scheduling data and production execution data are connected, allowing real-time visibility of execution status, quickly identifying abnormal work orders, and making effective adjustments.

  4. Convenient adjustment and order-processing capabilities

    Offers editing and planning adjustment functions to meet planning adjustment needs in different scenarios, assisting planners in efficiently completing scenarios such as order processing through multiple function supports on the planning adjustment page.


Solution Details

Value 1: Efficient One-Click Scheduling System

One-click scheduling: Rapidly runs scheduling results based on pre-set scheduling parameters, considering factors such as equipment capacity utilization, task priorities, deadlines, etc., taking only seconds for the entire process.

Multiple scheme comparisons: The scheduling page supports calculating and comparing multiple different scheduling results, looking at different results' deadlines and resource utilization, helping to select suitable schemes for specific production environments and goals, thus improving production efficiency, reducing costs, and ensuring timely delivery.

Flexible customization functions: Scheduling algorithms can configure different scheduling parameters based on processes and scenarios, meeting different scheduling needs for various stages of the customer’s production line. It also supports low-cost customized scheduling parameters to meet customized scenarios Scenario & Interface Graph Schedule Planning


Value 2: Rich Scenario-Supported Scheduling Algorithms

  • Limited Capacity: Considers equipment capacity for scheduling

  • Unlimited Capacity: Does not consider resource capacity, only calculates standard working hours

  • Task Division: Configures task split rules, supporting division by quantity, time, shifts, and other patterns

  • Resource Utilization

  • Mold Scheduling: Scheduling considers molds; scheduling occurs only when both molds and resources are free.

  • Production Line Scheduling: Retrieves the corresponding production line during scheduling, scheduling as per the overall production line.

  • Shortest Delivery Time: Schedules as many devices as possible to produce under capacity consideration.

  • Least Resources: Maximizes resource utilization under meeting deadlines.

  • Batch Production Scheduling: Considers processing time and resource usage for each batch during scheduling.

  • Scheduling by BOM: When scheduling multiple hierarchical materials simultaneously, considers the BOM hierarchy relationship to schedule materials at the same level sequentially.

  • Production Order Priority: Schedules production orders in sequence according to the priority order specified by the user. Scenario & Interface Graph Schematic Diagram of Scheduling Algorithm Scheduling Parameters


Value 3: Real-time Monitoring and Feedback

Multi-dimensional data viewing: Provides views including production order processes, task orders, resources, production lines, BOM hierarchies, etc., supporting intuitive viewing via Gantt charts or list views for detailed information.

Real-time task execution status: Real-time tracking of each task's reporting progress, overdue status, material preparedness, and previous process reporting progress, quickly identifies abnormal work orders, allowing effective adjustments for abnormal production tasks and improving plan achievement rates.

Data analysis and decision support: By collecting and analyzing large amounts of production data, it helps planners develop more scientific and reasonable production strategies and policies. Scenario & Interface Graph Production Process View Task Order Scheduling View Production Line Scheduling View

Value 4: Convenient Planning Adjustments and Order Processing Functions

One-click quick adjustments: Rapidly outputs adjusted results based on current capacity and equipment operation status.

Overdue work orders automatically adjusted: Overdue work orders are automatically judged and re-planned according to capacity conditions, keeping track of the latest delivery status in real-time.

Abundant reference information: Real-time monitoring of production status for each process on the production line, quickly assessing resource load. Scenario & Interface Graph Planning Adjustments


Application Value 👍

  1. Significantly reduces the workload of planners, greatly lowers labor costs for planners, saving up to over 50% of related labor costs;

  1. Material supply is timely, with raw material inventory turnover rate increasing by over 20%

  1. Equipment capacity is fully utilized, with OEE improving by 20%

  1. Reasonably arranges production plans, prioritizing urgent orders, important orders, etc., improving on-time delivery rate by 20%

  1. Number of overdue orders significantly reduced by 50%, even occasional overdue cases will be quickly adjusted, enhancing delivery reliability.

  1. Workshop planning results align more with the actual production site, with production plan achievement rates increasing by over 15%

  1. Workshop planning fully considers the utilization of resources such as personnel and equipment, rationally allocates capacity, significantly enhancing workshop-level production efficiency by 20%


Application Customers

Appendix PPT

👏Product Information Introduction_ Schedule Planning.pptx



Learn More

👉 Book a 'Product DEMO' demonstration now!


👉 Book a 'Product DEMO' demonstration now!


Narrative Card

💡 ' Schedule Planning '

The New Core Cloud Workshop Planning solution focuses on core production management, striving to enhance production efficiency, reduce costs, and ensure product quality by integrating resources and task arrangements across the entire process. This solution is initiated based on the production instructions generated by the MRP system, guided by product delivery deadlines, priorities, and workshop resource status, precisely allocating part production tasks to matching workshops, production lines, equipment, and personnel. At the same time, daily production action plans are formulated, and real-time dynamic information collection capabilities are utilized to flexibly adjust production progress, ensuring the efficient execution of the plan and the achievement of objectives.


👉 Click here for a one-minute video to understand 'Schedule Planning'!


Industry Pain Points and Breakthrough Points

🌑 Before Application (BEFORE)

  1. Difficulties in coordinating supply chain resource planning and workshop production planning, wasting manpower

  2. Complex production rules and intricate processes: Different products have various requirements for labor, machines, materials, methods, environments, etc., coupled with complex production switching rules, making it challenging for manual scheduling to fully consider all possibilities, affecting scheduling efficiency and quality, heavily relying on experienced planners.

🌕 After Application (AFTER)

  1. Efficient scheduling, one-click delivery, saving labor and time costs for enterprises

  2. Low learning costs, the ability to formulate reliable scheduling plans is no longer limited to specific groups, scheduling algorithms reference actual workshop data to assist planners in understanding the site, including adjustments for abnormal work orders.

  3. Scheduling results are precise to equipment and shifts, ensuring that scheduling results are consistent with production site capacity load.


Scenario Analysis


Scenario Pain Points

  1. High scheduling costs and dependency on experience

    Workshop planning requires multiple planners to collaborate, record workshop conditions, and summarize plans. To ensure the reliability of the plan, it is necessary to hire a large number of planners. If personnel changes occur, it can lead to instability and chaos in planning results in a short time.

  2. Limited dimensions in scheduling consideration

    The scheduling fails to consider the复杂多样的 execution situations on the production site, making the output scheduling results hard to land, with actual production having weak reliance on and reference value for the schedule.

  3. Delayed feedback on production progress

    Traditional management methods lack effective feedback mechanisms for workshop production progress, making it difficult for planners to make targeted adjustments when encountering abnormal events; subsequent scheduling may also be affected by abnormal situations.

  4. Frequent changes in production demands

    Frequent changes in customer demands mean that one change impacts the entire plan. It is challenging to adjust rapidly, and planners are hesitant to make adjustments, making it difficult to meet order delivery needs.


New Core Cloud Schedule Planning Solution

  1. Efficient one-click scheduling system

    By considering production orders and resource availability comprehensively, production tasks and optimization levels are rationally arranged to quickly output scheduling results that meet customer demands.

  2. Scheduling algorithms supporting various scenarios

    Provides over twenty scheduling parameters that can be freely combined according to actual scenarios, meeting different scheduling needs. Preset algorithms for general scenarios can help customers quickly resolve scheduling pain points.

  3. Real-time monitoring and feedback

    Provides multiple dimensional views of scheduling, helping planners quickly access effective information. Scheduling data and production execution data are connected, allowing real-time visibility of execution status, quickly identifying abnormal work orders, and making effective adjustments.

  4. Convenient adjustment and order-processing capabilities

    Offers editing and planning adjustment functions to meet planning adjustment needs in different scenarios, assisting planners in efficiently completing scenarios such as order processing through multiple function supports on the planning adjustment page.


Solution Details

Value 1: Efficient One-Click Scheduling System

One-click scheduling: Rapidly runs scheduling results based on pre-set scheduling parameters, considering factors such as equipment capacity utilization, task priorities, deadlines, etc., taking only seconds for the entire process.

Multiple scheme comparisons: The scheduling page supports calculating and comparing multiple different scheduling results, looking at different results' deadlines and resource utilization, helping to select suitable schemes for specific production environments and goals, thus improving production efficiency, reducing costs, and ensuring timely delivery.

Flexible customization functions: Scheduling algorithms can configure different scheduling parameters based on processes and scenarios, meeting different scheduling needs for various stages of the customer’s production line. It also supports low-cost customized scheduling parameters to meet customized scenarios Scenario & Interface Graph Schedule Planning


Value 2: Rich Scenario-Supported Scheduling Algorithms

  • Limited Capacity: Considers equipment capacity for scheduling

  • Unlimited Capacity: Does not consider resource capacity, only calculates standard working hours

  • Task Division: Configures task split rules, supporting division by quantity, time, shifts, and other patterns

  • Resource Utilization

  • Mold Scheduling: Scheduling considers molds; scheduling occurs only when both molds and resources are free.

  • Production Line Scheduling: Retrieves the corresponding production line during scheduling, scheduling as per the overall production line.

  • Shortest Delivery Time: Schedules as many devices as possible to produce under capacity consideration.

  • Least Resources: Maximizes resource utilization under meeting deadlines.

  • Batch Production Scheduling: Considers processing time and resource usage for each batch during scheduling.

  • Scheduling by BOM: When scheduling multiple hierarchical materials simultaneously, considers the BOM hierarchy relationship to schedule materials at the same level sequentially.

  • Production Order Priority: Schedules production orders in sequence according to the priority order specified by the user. Scenario & Interface Graph Schematic Diagram of Scheduling Algorithm Scheduling Parameters


Value 3: Real-time Monitoring and Feedback

Multi-dimensional data viewing: Provides views including production order processes, task orders, resources, production lines, BOM hierarchies, etc., supporting intuitive viewing via Gantt charts or list views for detailed information.

Real-time task execution status: Real-time tracking of each task's reporting progress, overdue status, material preparedness, and previous process reporting progress, quickly identifies abnormal work orders, allowing effective adjustments for abnormal production tasks and improving plan achievement rates.

Data analysis and decision support: By collecting and analyzing large amounts of production data, it helps planners develop more scientific and reasonable production strategies and policies. Scenario & Interface Graph Production Process View Task Order Scheduling View Production Line Scheduling View

Value 4: Convenient Planning Adjustments and Order Processing Functions

One-click quick adjustments: Rapidly outputs adjusted results based on current capacity and equipment operation status.

Overdue work orders automatically adjusted: Overdue work orders are automatically judged and re-planned according to capacity conditions, keeping track of the latest delivery status in real-time.

Abundant reference information: Real-time monitoring of production status for each process on the production line, quickly assessing resource load. Scenario & Interface Graph Planning Adjustments


Application Value 👍

  1. Significantly reduces the workload of planners, greatly lowers labor costs for planners, saving up to over 50% of related labor costs;

  1. Material supply is timely, with raw material inventory turnover rate increasing by over 20%

  1. Equipment capacity is fully utilized, with OEE improving by 20%

  1. Reasonably arranges production plans, prioritizing urgent orders, important orders, etc., improving on-time delivery rate by 20%

  1. Number of overdue orders significantly reduced by 50%, even occasional overdue cases will be quickly adjusted, enhancing delivery reliability.

  1. Workshop planning results align more with the actual production site, with production plan achievement rates increasing by over 15%

  1. Workshop planning fully considers the utilization of resources such as personnel and equipment, rationally allocates capacity, significantly enhancing workshop-level production efficiency by 20%


Application Customers

Appendix PPT

👏Product Information Introduction_ Schedule Planning.pptx



Learn More

👉 Book a 'Product DEMO' demonstration now!


👉 Book a 'Product DEMO' demonstration now!


Narrative Card

💡 ' Schedule Planning '

The New Core Cloud Workshop Planning solution focuses on core production management, striving to enhance production efficiency, reduce costs, and ensure product quality by integrating resources and task arrangements across the entire process. This solution is initiated based on the production instructions generated by the MRP system, guided by product delivery deadlines, priorities, and workshop resource status, precisely allocating part production tasks to matching workshops, production lines, equipment, and personnel. At the same time, daily production action plans are formulated, and real-time dynamic information collection capabilities are utilized to flexibly adjust production progress, ensuring the efficient execution of the plan and the achievement of objectives.


👉 Click here for a one-minute video to understand 'Schedule Planning'!


Industry Pain Points and Breakthrough Points

🌑 Before Application (BEFORE)

  1. Difficulties in coordinating supply chain resource planning and workshop production planning, wasting manpower

  2. Complex production rules and intricate processes: Different products have various requirements for labor, machines, materials, methods, environments, etc., coupled with complex production switching rules, making it challenging for manual scheduling to fully consider all possibilities, affecting scheduling efficiency and quality, heavily relying on experienced planners.

🌕 After Application (AFTER)

  1. Efficient scheduling, one-click delivery, saving labor and time costs for enterprises

  2. Low learning costs, the ability to formulate reliable scheduling plans is no longer limited to specific groups, scheduling algorithms reference actual workshop data to assist planners in understanding the site, including adjustments for abnormal work orders.

  3. Scheduling results are precise to equipment and shifts, ensuring that scheduling results are consistent with production site capacity load.


Scenario Analysis


Scenario Pain Points

  1. High scheduling costs and dependency on experience

    Workshop planning requires multiple planners to collaborate, record workshop conditions, and summarize plans. To ensure the reliability of the plan, it is necessary to hire a large number of planners. If personnel changes occur, it can lead to instability and chaos in planning results in a short time.

  2. Limited dimensions in scheduling consideration

    The scheduling fails to consider the复杂多样的 execution situations on the production site, making the output scheduling results hard to land, with actual production having weak reliance on and reference value for the schedule.

  3. Delayed feedback on production progress

    Traditional management methods lack effective feedback mechanisms for workshop production progress, making it difficult for planners to make targeted adjustments when encountering abnormal events; subsequent scheduling may also be affected by abnormal situations.

  4. Frequent changes in production demands

    Frequent changes in customer demands mean that one change impacts the entire plan. It is challenging to adjust rapidly, and planners are hesitant to make adjustments, making it difficult to meet order delivery needs.


New Core Cloud Schedule Planning Solution

  1. Efficient one-click scheduling system

    By considering production orders and resource availability comprehensively, production tasks and optimization levels are rationally arranged to quickly output scheduling results that meet customer demands.

  2. Scheduling algorithms supporting various scenarios

    Provides over twenty scheduling parameters that can be freely combined according to actual scenarios, meeting different scheduling needs. Preset algorithms for general scenarios can help customers quickly resolve scheduling pain points.

  3. Real-time monitoring and feedback

    Provides multiple dimensional views of scheduling, helping planners quickly access effective information. Scheduling data and production execution data are connected, allowing real-time visibility of execution status, quickly identifying abnormal work orders, and making effective adjustments.

  4. Convenient adjustment and order-processing capabilities

    Offers editing and planning adjustment functions to meet planning adjustment needs in different scenarios, assisting planners in efficiently completing scenarios such as order processing through multiple function supports on the planning adjustment page.


Solution Details

Value 1: Efficient One-Click Scheduling System

One-click scheduling: Rapidly runs scheduling results based on pre-set scheduling parameters, considering factors such as equipment capacity utilization, task priorities, deadlines, etc., taking only seconds for the entire process.

Multiple scheme comparisons: The scheduling page supports calculating and comparing multiple different scheduling results, looking at different results' deadlines and resource utilization, helping to select suitable schemes for specific production environments and goals, thus improving production efficiency, reducing costs, and ensuring timely delivery.

Flexible customization functions: Scheduling algorithms can configure different scheduling parameters based on processes and scenarios, meeting different scheduling needs for various stages of the customer’s production line. It also supports low-cost customized scheduling parameters to meet customized scenarios Scenario & Interface Graph Schedule Planning


Value 2: Rich Scenario-Supported Scheduling Algorithms

  • Limited Capacity: Considers equipment capacity for scheduling

  • Unlimited Capacity: Does not consider resource capacity, only calculates standard working hours

  • Task Division: Configures task split rules, supporting division by quantity, time, shifts, and other patterns

  • Resource Utilization

  • Mold Scheduling: Scheduling considers molds; scheduling occurs only when both molds and resources are free.

  • Production Line Scheduling: Retrieves the corresponding production line during scheduling, scheduling as per the overall production line.

  • Shortest Delivery Time: Schedules as many devices as possible to produce under capacity consideration.

  • Least Resources: Maximizes resource utilization under meeting deadlines.

  • Batch Production Scheduling: Considers processing time and resource usage for each batch during scheduling.

  • Scheduling by BOM: When scheduling multiple hierarchical materials simultaneously, considers the BOM hierarchy relationship to schedule materials at the same level sequentially.

  • Production Order Priority: Schedules production orders in sequence according to the priority order specified by the user. Scenario & Interface Graph Schematic Diagram of Scheduling Algorithm Scheduling Parameters


Value 3: Real-time Monitoring and Feedback

Multi-dimensional data viewing: Provides views including production order processes, task orders, resources, production lines, BOM hierarchies, etc., supporting intuitive viewing via Gantt charts or list views for detailed information.

Real-time task execution status: Real-time tracking of each task's reporting progress, overdue status, material preparedness, and previous process reporting progress, quickly identifies abnormal work orders, allowing effective adjustments for abnormal production tasks and improving plan achievement rates.

Data analysis and decision support: By collecting and analyzing large amounts of production data, it helps planners develop more scientific and reasonable production strategies and policies. Scenario & Interface Graph Production Process View Task Order Scheduling View Production Line Scheduling View

Value 4: Convenient Planning Adjustments and Order Processing Functions

One-click quick adjustments: Rapidly outputs adjusted results based on current capacity and equipment operation status.

Overdue work orders automatically adjusted: Overdue work orders are automatically judged and re-planned according to capacity conditions, keeping track of the latest delivery status in real-time.

Abundant reference information: Real-time monitoring of production status for each process on the production line, quickly assessing resource load. Scenario & Interface Graph Planning Adjustments


Application Value 👍

  1. Significantly reduces the workload of planners, greatly lowers labor costs for planners, saving up to over 50% of related labor costs;

  1. Material supply is timely, with raw material inventory turnover rate increasing by over 20%

  1. Equipment capacity is fully utilized, with OEE improving by 20%

  1. Reasonably arranges production plans, prioritizing urgent orders, important orders, etc., improving on-time delivery rate by 20%

  1. Number of overdue orders significantly reduced by 50%, even occasional overdue cases will be quickly adjusted, enhancing delivery reliability.

  1. Workshop planning results align more with the actual production site, with production plan achievement rates increasing by over 15%

  1. Workshop planning fully considers the utilization of resources such as personnel and equipment, rationally allocates capacity, significantly enhancing workshop-level production efficiency by 20%


Application Customers

Appendix PPT

👏Product Information Introduction_ Schedule Planning.pptx



Learn More

👉 Book a 'Product DEMO' demonstration now!


News

Our latest news & blog

FAQs

Learn More? Contact us!

1. What types of discrete manufacturing is New Core Cloud suitable for?
2. What are New Core Cloud's competitive advantages in consumer electronics?
3. What is the typical implementation timeline for New Core Cloud?
4. Does the solution support end-to-end traceability?
5. How does New Core Cloud charge for its services
6. Can you integrate with ERP systems?
7. Is an English version available for international operations?

FAQs

Learn More? Contact us!

1. What types of discrete manufacturing is New Core Cloud suitable for?
2. What are New Core Cloud's competitive advantages in consumer electronics?
3. What is the typical implementation timeline for New Core Cloud?
4. Does the solution support end-to-end traceability?
5. How does New Core Cloud charge for its services
6. Can you integrate with ERP systems?
7. Is an English version available for international operations?

FAQs

Learn More? Contact us!

1. What types of discrete manufacturing is New Core Cloud suitable for?
2. What are New Core Cloud's competitive advantages in consumer electronics?
3. What is the typical implementation timeline for New Core Cloud?
4. Does the solution support end-to-end traceability?
5. How does New Core Cloud charge for its services
6. Can you integrate with ERP systems?
7. Is an English version available for international operations?

Contact us!

Learn more? Contact us !

+(86)400-164-1521

contact@xinheyun.com

Headquarters: 10th Floor, Building A6, No. 1528, Gumei Road, Xuhui District, Shanghai, China

Singapore · Guangzhou · Chengdu · Hangzhou · Hefei · Nanjing · Shijiazhuang

Get a Demo

Our MES expert will contact you in 24hrs.

Contact us!

Learn more? Contact us !

+(86)400-164-1521

contact@xinheyun.com

Headquarters: 10th Floor, Building A6, No. 1528, Gumei Road, Xuhui District, Shanghai, China

Singapore · Guangzhou · Chengdu · Hangzhou · Hefei · Nanjing · Shijiazhuang

Get a Demo

Our MES expert will contact you in 24hrs.

Contact us!

Learn more? Contact us !

+(86)400-164-1521

contact@xinheyun.com

Headquarters: 10th Floor, Building A6, No. 1528, Gumei Road, Xuhui District, Shanghai, China

Singapore · Guangzhou · Chengdu · Hangzhou · Hefei · Nanjing · Shijiazhuang

Get a Demo

Our MES expert will contact you in 24hrs.